Our Missouri sample lists 2 sites in New Florence (Montgomery County): Google Project Spade (planned); Amazon Project Green (planned). Distances are straight-line miles only — not an appraisal or legal advice.
From our curated Missouri sample. Status and town as recorded in the dataset.
Google Project Spade
Planned · New Florence · Google
934 acres in the southeast quadrant of I-70 and Highway 19 (Montgomery County FAQ); ~1.2 GW campus
Amazon Project Green
Planned · New Florence · Amazon Web Services
Proposed campus in the northeast quadrant of I-70 and Highway 19 (Montgomery County FAQ)
Confirmed substations, transmission, generation, water, and other supporting projects linked to sample sites in or near New Florence. Sourced from utility, PSC, and local government filings — not a complete inventory.
Lumberjack 345 kV substation (new)
Substationproposed · In service: 2027-12-01 (IRP)
Built for this data centerJust southeast of New Florence, south of I-70 (per Crossroads fact-sheet map; no coordinates published)
Ameren Missouri (Ameren Transmission)
Nightingale substation (new)
Substationproposed · In service: Crossroads construction 2027; in service ~2028
Built for this data centerEast/northeast of New Florence near Hwy F (per fact-sheet map; no coordinates published)
Ameren Missouri
Crossroads Connector Phase 1 (~4 mi double-circuit 345 kV)
Transmissionproposed
Built for this data centerLumberjack substation (SE of New Florence) west to existing Montgomery–Callaway 345 kV line west of New Florence
Ameren Missouri
Crossroads Connector Phase 2 (~18 mi double-circuit 345 kV)
Transmissionproposed
Built for this data centerFloat substation (west of Warrenton) west along the I-70 corridor to Nightingale (E of New Florence) and Lumberjack (SE of New Florence)
Ameren Missouri
Load addition at Montgomery 161 kV substation (250 MW datacenter)
Substationapproved · In service: 2026-12-01
Built for this data centerExisting Montgomery substation, northwest of New Florence (third-party maps place it ~2.5 mi from Spade)
Ameren Missouri
Montgomery 345 kV temporary tap (Elkhorn Phase 1)
Transmissionproposed · In service: 2027-12-30
Temporary taps on the Montgomery–Lumberjack 345 kV line (New Florence area)
Ameren Missouri
Elkhorn 345 kV substation (new) + 280 MVAR capacitor bank
Substationproposed · In service: 2028-12-01
Cuts into the Odyssey–Montgomery 345 kV line; 3.25 mi double-circuit 345 kV from Lumberjack (exact site not public)
Ameren Missouri
Montgomery 345 kV terminal equipment upgrade to 4000 A
Substationproposed · In service: 2029-12-01
Existing Montgomery substation, NW of New Florence
Ameren Missouri
Warren II Storage (MISO queue J2179)
Battery storageproposed · In service: 2028-12-01 (interconnection)
Interconnects at Montgomery 345 kV substation (plant site location not given)
Developer not named in IRP
Project Spade on-site substations (Ameren substation + applicant-owned substation)
Substationproposed
Built for this data centerOn the Spade site, SE quadrant of I-70 & MO-19, New Florence
Ameren Missouri / Google (applicant)
Project Spade on-site wells, domestic wastewater treatment facility and stormwater ponds
Waterproposed
Built for this data centerOn the Spade site, SE quadrant of I-70 & MO-19
Google (applicant)
Project Green deep industrial wells (1,600–2,000 ft) + rainwater harvesting
Waterproposed
Built for this data centerProject Green site, NE quadrant of I-70 & MO-19
Amazon (applicant), under Montgomery County PWSD #1
Montgomery–Callaway Connector (~28 mi double-circuit 345 kV, Burns–Montgomery)
Transmissionproposed
From Burns (Callaway Co.) to Montgomery substation near New Florence
Ameren Missouri
Missouri street, city, or ZIP. Rural roads use the U.S. Census address file, then OpenStreetMap for cities and ZIPs.
Street addresses are matched with the U.S. Census geocoder; cities and ZIPs use OpenStreetMap. Distances are straight-line miles to a curated sample of operating and planned Missouri data centers. This is not an appraisal, a survey, or legal advice. Confirm with county planning and a licensed professional.
All Missouri county pages · Living near a data center · Home
Street addresses are matched with the U.S. Census geocoder; cities and ZIPs use OpenStreetMap. Distances are straight-line miles to a curated sample of operating and planned Missouri data centers. This is not an appraisal, a survey, or legal advice. Confirm with county planning and a licensed professional.