Our Missouri sample lists 1 known or proposed site in Warren County: Crusoe Warrenton Campus in Warrenton (planned). Enter an address to measure straight-line miles. This is not an appraisal or legal advice.
From our curated Missouri sample. Status and town as recorded in the dataset.
Crusoe Warrenton Campus
Planned · Warrenton · Crusoe
Large planned AI campus in Warren County along the I-70 corridor
Entries recorded in adjacent counties that appear in the sample.
Google Project Spade
Planned · New Florence · Montgomery County · Google
934 acres in the southeast quadrant of I-70 and Highway 19 (Montgomery County FAQ); ~1.2 GW campus
Amazon Project Green
Planned · New Florence · Montgomery County · Amazon Web Services
Proposed campus in the northeast quadrant of I-70 and Highway 19 (Montgomery County FAQ)
St. Charles Data Center
Announced · Wentzville · St. Charles County · Regional operator
Along the I-70 corridor
Beltline Energy Meramec Valley
Planned · Pacific · Franklin County · Beltline Energy
Withdrew City of Pacific zoning application Aug 7, 2026 (Heartland Newsfeed); pursuing unincorporated Franklin County. County board approved rezoning for Beltline and Gateway Digital Campus Sept 15, 2026 (Spectrum News).
Provident Data Centers Gray Summit
Announced · Gray Summit · Franklin County · Provident Data Centers
Also reported as Gateway Digital Campus / Diamond Farms (~575–613 acres near Shaw Nature Reserve / I-44 south of Gray Summit). Franklin County rezoned Sept 15, 2026 (Spectrum News).
Confirmed substations, transmission, generation, water, and other supporting projects linked to sample sites in or near Warren County. Sourced from utility, PSC, and local government filings — not a complete inventory.
Float substation (new)
Substationproposed · In service: 2028
Built for this data centerWest of Warrenton, east of Pendleton near I-70/US-40 (per fact-sheet map; no coordinates published)
Ameren Missouri
Crossroads Connector Phase 2 (~18 mi double-circuit 345 kV)
Transmissionproposed
Built for this data centerFloat substation (west of Warrenton) west along the I-70 corridor to Nightingale (E of New Florence) and Lumberjack (SE of New Florence)
Ameren Missouri
Crusoe-owned substation (on site)
Substationapproved
Built for this data centerOn Crusoe campus north of the Warrenton West I-70 interchange; 400-ft setback
Crusoe
Ameren-owned switchyard (on Crusoe site)
Substationapproved
Built for this data centerOn Crusoe campus; 150-ft setback
Ameren Missouri
Northwest Service Road sewer extension
Waterapproved
Crosses NW Service Rd, Warrenton (exact spot not given)
City of Warrenton
Missouri street, city, or ZIP. Rural roads use the U.S. Census address file, then OpenStreetMap for cities and ZIPs.
Street addresses are matched with the U.S. Census geocoder; cities and ZIPs use OpenStreetMap. Distances are straight-line miles to a curated sample of operating and planned Missouri data centers. This is not an appraisal, a survey, or legal advice. Confirm with county planning and a licensed professional.
All Missouri county pages · Living near a data center · Home
Street addresses are matched with the U.S. Census geocoder; cities and ZIPs use OpenStreetMap. Distances are straight-line miles to a curated sample of operating and planned Missouri data centers. This is not an appraisal, a survey, or legal advice. Confirm with county planning and a licensed professional.