No site in our curated sample is recorded in Gasconade County. Neighboring counties in the sample include Warren County, Montgomery County, Franklin County, with sites such as Crusoe Warrenton Campus (planned); Google Project Spade (planned); Amazon Project Green (planned); Beltline Energy Meramec Valley (planned). Measure any address below. Distance only — not an appraisal or legal advice.
No site in our sample is recorded in Gasconade County. These entries are in adjacent counties that do appear in the sample.
Crusoe Warrenton Campus
Planned · Warrenton · Warren County · Crusoe
Large planned AI campus in Warren County along the I-70 corridor
Google Project Spade
Planned · New Florence · Montgomery County · Google
934 acres in the southeast quadrant of I-70 and Highway 19 (Montgomery County FAQ); ~1.2 GW campus
Amazon Project Green
Planned · New Florence · Montgomery County · Amazon Web Services
Proposed campus in the northeast quadrant of I-70 and Highway 19 (Montgomery County FAQ)
Beltline Energy Meramec Valley
Planned · Pacific · Franklin County · Beltline Energy
Withdrew City of Pacific zoning application Aug 7, 2026 (Heartland Newsfeed); pursuing unincorporated Franklin County. County board approved rezoning for Beltline and Gateway Digital Campus Sept 15, 2026 (Spectrum News).
Provident Data Centers Gray Summit
Announced · Gray Summit · Franklin County · Provident Data Centers
Also reported as Gateway Digital Campus / Diamond Farms (~575–613 acres near Shaw Nature Reserve / I-44 south of Gray Summit). Franklin County rezoned Sept 15, 2026 (Spectrum News).
Confirmed substations, transmission, generation, water, and other supporting projects linked to sample sites in or near Gasconade County. Sourced from utility, PSC, and local government filings — not a complete inventory.
Lumberjack 345 kV substation (new)
Substationproposed · In service: 2027-12-01 (IRP)
Built for this data centerJust southeast of New Florence, south of I-70 (per Crossroads fact-sheet map; no coordinates published)
Ameren Missouri (Ameren Transmission)
Nightingale substation (new)
Substationproposed · In service: Crossroads construction 2027; in service ~2028
Built for this data centerEast/northeast of New Florence near Hwy F (per fact-sheet map; no coordinates published)
Ameren Missouri
Float substation (new)
Substationproposed · In service: 2028
Built for this data centerWest of Warrenton, east of Pendleton near I-70/US-40 (per fact-sheet map; no coordinates published)
Ameren Missouri
Crossroads Connector Phase 1 (~4 mi double-circuit 345 kV)
Transmissionproposed
Built for this data centerLumberjack substation (SE of New Florence) west to existing Montgomery–Callaway 345 kV line west of New Florence
Ameren Missouri
Crossroads Connector Phase 2 (~18 mi double-circuit 345 kV)
Transmissionproposed
Built for this data centerFloat substation (west of Warrenton) west along the I-70 corridor to Nightingale (E of New Florence) and Lumberjack (SE of New Florence)
Ameren Missouri
Load addition at Montgomery 161 kV substation (250 MW datacenter)
Substationapproved · In service: 2026-12-01
Built for this data centerExisting Montgomery substation, northwest of New Florence (third-party maps place it ~2.5 mi from Spade)
Ameren Missouri
Montgomery 345 kV temporary tap (Elkhorn Phase 1)
Transmissionproposed · In service: 2027-12-30
Temporary taps on the Montgomery–Lumberjack 345 kV line (New Florence area)
Ameren Missouri
Montgomery 345 kV terminal equipment upgrade to 4000 A
Substationproposed · In service: 2029-12-01
Existing Montgomery substation, NW of New Florence
Ameren Missouri
Project Spade on-site substations (Ameren substation + applicant-owned substation)
Substationproposed
Built for this data centerOn the Spade site, SE quadrant of I-70 & MO-19, New Florence
Ameren Missouri / Google (applicant)
Project Spade on-site wells, domestic wastewater treatment facility and stormwater ponds
Waterproposed
Built for this data centerOn the Spade site, SE quadrant of I-70 & MO-19
Google (applicant)
Project Green deep industrial wells (1,600–2,000 ft) + rainwater harvesting
Waterproposed
Built for this data centerProject Green site, NE quadrant of I-70 & MO-19
Amazon (applicant), under Montgomery County PWSD #1
Montgomery–Callaway Connector (~28 mi double-circuit 345 kV, Burns–Montgomery)
Transmissionproposed
From Burns (Callaway Co.) to Montgomery substation near New Florence
Ameren Missouri
Crusoe-owned substation (on site)
Substationapproved
Built for this data centerOn Crusoe campus north of the Warrenton West I-70 interchange; 400-ft setback
Crusoe
Ameren-owned switchyard (on Crusoe site)
Substationapproved
Built for this data centerOn Crusoe campus; 150-ft setback
Ameren Missouri
Northwest Service Road sewer extension
Waterapproved
Crosses NW Service Rd, Warrenton (exact spot not given)
City of Warrenton
Franklin County Connector: Tibbe–Gray Summit ~11 mi 138 kV line + Gray Summit substation upgrades
Transmissionproposed · In service: winter 2029
New Tibbe substation (E State Hwy 47 & College Rd, Union) east to existing Gray Summit substation on Old Highway 100
Ameren Missouri
Wildwood–Gray Summit-2 138 kV line upgrade to 2000 A (14.88 mi)
Transmissionproposed · In service: 2026-12-01
Existing corridor between Gray Summit and Wildwood substations
Ameren Missouri
Gateway Digital Campus developer-funded transmission and water/sewer upgrades
Otherproposed
Built for this data centerMO-100 & I-44, Villa Ridge/Gray Summit (specific facilities not described)
Provident (developer) / Ameren / local utilities
Pacific wastewater treatment plant upgrade (Beltline funding offer for effluent cooling)
Waterproposed
Built for this data centerExisting Pacific WWTP (location not given in article)
City of Pacific (Beltline Energy offered funding)
Missouri street, city, or ZIP. Rural roads use the U.S. Census address file, then OpenStreetMap for cities and ZIPs.
Street addresses are matched with the U.S. Census geocoder; cities and ZIPs use OpenStreetMap. Distances are straight-line miles to a curated sample of operating and planned Missouri data centers. This is not an appraisal, a survey, or legal advice. Confirm with county planning and a licensed professional.
All Missouri county pages · Living near a data center · Home
Street addresses are matched with the U.S. Census geocoder; cities and ZIPs use OpenStreetMap. Distances are straight-line miles to a curated sample of operating and planned Missouri data centers. This is not an appraisal, a survey, or legal advice. Confirm with county planning and a licensed professional.